NASA changes lunar landing plans to target a 2028 return
NASA and its contractors have streamlined lunar lander designs and changed mission operations, replacing a shared lunar rendezvous orbit with partner-specific orbits to support a 2028 landing. [5] Artemis III is now planned to take four astronauts into low Earth orbit in 2027 to test docking with both providers’ hardware; NASA will select the first lunar landing provider based on readiness. [5][8][9] AP also reported the agency’s accelerated push toward a lunar return and Moon base. [7]
NASA is building an alternative path to the lunar surface if either SpaceX or Blue Origin encounters technical or supply-chain delays, rather than making the first landing depend on one provider’s schedule. [8] The decision also makes readiness testing central to which company gets the first crewed landing. [5]
Key insights
- Artemis III’s immediate destination is Earth orbit, where crews can test critical rendezvous and docking procedures before lunar landing missions. [8][9]
- The landers and Orion will no longer meet in a near-rectilinear halo orbit; each provider’s rendezvous orbit will reflect its own system. [5]
- For initial lunar missions, two astronauts will descend while two remain aboard Orion, with NASA targeting two approximately two-hour moonwalks. [5]
- The first landing assignment remains open: NASA says lander readiness will determine the provider, with a second crewed landing opportunity to follow. [5]